Architectural plans for the Terehunga factory of the Tamaki Co-operative Dairy Company Limited. Created by architects Duffill and Gibson in 1922-1923.
Maker
Rough & Duffill
Primary Maker
Rough & Duffill
Department
Archives
Classification
Production Date
1922-1923

Archive Contents

  Folder

1. T9 1/4 inch scale detail of cool room construction showing floor plan, longitudinal section and elevation. Dated April 1923.

2. T9.1 Levels and drainage plan. Dated March 1923. 'Sheet No.4' written in bottom left quadrant. Scale 1/8 inch to 1 foot.

3. T9.2 Plan showing elevations and 1/2 details of beam reinforcements and milk recieving stage. Dated March 1923. 'Sheet No.3' written in bottom left quadrant.

4. T9.3 Amended floor plan. Dated June 1923. Scale 1/8 inch to 1 foot.

5. T9.4 Amended plan of engine room, boiler room and coal store showing floor plan and elevation. Dated May 1923.

6. T9.5 Floor plan. Dated March 1922. 'Sheet No.1' written in bottom left quadrant. Scale 1/8 inch to 1 foot.

7. T9.6 Plan showing sections and 1/2 inch scale detail of cream receiving stage. Dated March 1923. 'Sheet No.2' written in bottom left quadrant.