Stratford Racing Club [plans]

Production date
1935-1938
1944
Description
Architectural plans for the Stratford Racing Club. Includes plans of the totalisator house, steward's stand, racecourse, training tracks and tearoom. Created by architects Duffill and Gibson in 1935-1938 and 1944.
See full details

Object detail

Artist/Maker
Production role
Architect
Production date
1935-1938
1944
Production place
Subject person
Classification
Item list

  Folder

1. S20 Suggestion for totalisator showing end elevations, sections and calculators platform. 'N. Hayley' written in bottom right quadrant. Scale 1/4 inch to 1 foot.

2. S20.1 Locality plan for new totalisator house. Scale 1/8 inch to 1 foot.

3. S20.2 Plan for totalisator house showing back elevation and cross section. Created by Duffill & Gibson, dated September 1936. 'Sheet No.2' written in top right quadrant. Scale 1/8 and 1/4 inch to 1 foot.

4. S20.3 Suggested plan for totalisator house showing floor plan and elevation. 'Copied from plans, N. Hayley Ap. 26 1936' written in bottom right quadrant. Scale 1/4 inch to 1 foot.

5. S20.4 Plan for totalisator house showing floor plan, elevations and sections. Dated 6 February 1936. 'Copied 27/4/36' written in top right quadrant. 'N. Hayley and A. Brown' written on reverse. Scale 1/8 inch to 1 foot.

6. S20.5 Suggested plans for totalisator house showing elevations and section. 'Copied from plans, N. Hayley April 26 1936' written in bottom right quadrant. Scale 1/4 inch to 1 foot.

7. S20.6 Plan of existing steward's stand showing ground floor and first floor plans.

8. S20.7 Suggested plan for totalisator house showing floor plan and front elevation. 'N. Hayley' written in bottom right quadrant. Scale 1/4 inch to 1 foot.

9. S20.8 Plan of proposed concrete steps overlooking birdcage. Created by Duffill & Gibson, dated October 1944. 'Sheet No.1' written in top right quadrant. Scale 1/8 and 1/2 inch to 1 foot.

10. S20.9 Plan of racecourse and training tracks. 'L.B' Davis, 20/7/33' written in bottom right quadrant. Scale 3/4 inch to 1 chain.

11. S20.10 Water and drainage plan. 'J.D.H' (registered architect) written in bottom right quadrant.

12. S20.11 Contract plan for additions to bar and stalls. Contract signed top right quadrant by Paynter & Barron (contractos). Created by Duffill & Gibson, dated June 1936. 'Set No.1 Sheet No.1' written in top right quadrant. 'E.89' written in top and bottom left quadrants. Scale 1/8 and 1/2 inch to 1 foot.

13. S20.12 Contract plan for alterations and additions to steward's stand, grandstand and lawn bar. Contract signed bottom right quadrant by V.C. Flack (contractor), dated 1 October 1938. Created by Duffill & Gibson, dated September 1938. 'Set No.1 Sheet No.2' written in top right quadrant. Scale 1/2 and 1/4 inch to 1 foot.

14. S20.13 Contract plan for alterations and additions to steward's stand, grandstand and lawn bar. Contract signed in center of plan by V.C. Flack (contractor), dated 1 October 1938. Created by Duffill & Gibson, dated September 1938. 'Set No.1 Sheet No.1' written in top right quadrant. 'E.89D' written in top and bottom left quadrants. Scale 1/8 inch to 1 foot.

15. S20.14 Contract plan for new balcony on steward's stand. Contract signed top left quadrant by J. Boone (contractor) and Malone (other signatures illegible), dated 20 September 1935. Created by Duffill and Gibson, dated July ? (part missing). 'Set No.2 Sheet No.2' written in top right quadrant. Scale 1/2 inch to 1 foot.

16. S20.15 Contract plan for new balcony on steward's stand. Contract signed top right quadrant by J. Boone (contractor) and Malone (other signatures illegible), dated 20 September 1935. Created by Duffill and Gibson, dated July 1935. 'Set No.2 Sheet No.21 written in top right quadrant. 'E89B' written in bottom left quadrant. Scale 8 feet to 1 inch.

17. S20.16 Contract plan for totalisator house showing floor plan, elevations and sections. Contract signed bottom left quadrant by Boon (contractor), dated 16 October 1936. Created by Duffill & Gibson, dated September 1936. 'Set No.1 Sheet No.1' written in top right quadrant. 'E89A' written in bottom right quadrant. Scale 1/8 inch to 1 foot.

18. S20.17 Contract plan for totalisator house showing cross section and back elevation. Contract signed top right quadrant by Boon (contractor), dated 16 October 1936. Created by Duffill & Gibson, dated September 1936. 'Set No.1 Sheet No.2' written in top right quadrant. Scale 1/2 and 1/8 inch to 1 foot.

19. S20.18 Contract plan for totalisator house showing showing detail of indicator house. Contract signed top right quadrant by Boon (contractor), dated 16 October 1936. Created by Duffill & Gibson, dated September 1936. 'Set No.1 Sheet No.3' written in top right quadrant. Scale 1/2 inch to 1 foot.

20. S20.19 Plan for totalisator house showing amended plan for indicator house. Created by Duffill & Gibson, dated March 1937. 'Sheet No.5' written in top right quadrant. Scale 1/8 inch to 1 foot.

21. S20.20 Contract plan showing conversion of old totalisator house into a tearoom and block plan and drainage plan. Contract signed in center by Boon (contractor), dated 16 October 1936. Created by Duffill & Gibson, dated September 1936. 'Set No.1 Sheet No.4' written in top right quadrant. Scale 1/8 and 1/32 inch to 1 foot.

22. S20.21 Plan for new balcony on steward's stand. Created by Duffill & Gibson, dated July 1935. 'White 6 / Blue 22' written in bottom right quadrant. Scale 1 inch to 8 feet.

23. S20.22 Plan for new balcony on steward's stand.

Accession number
ARC2004-1681
Collection type

Share

Public comments

Be the first to comment on this object record.

Google reCaptchaThis site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.