Ohura River Bridge [plans]

Production date
1945
Description
Engineering plans for the Ohura River Bridge created for the Stratford District Office by structural engineer Joseph Henry Hinchey, 1945.

Object detail

Artist/Maker
Production role
Creator
Production date
1945
Classification
Item list

  Folder

1. Ohura River Bridge, Preliminary Proposals. Prospective rendering of bridge in reinforced concrete, submitted to Stratford District Office for consideration. White copy.

2. Ohura River Bridge, Preliminary Proposals. Prospective rendering of bridge in reinforced concrete, submitted to Stratford District Office for consideration. Black copy.

3. Blueprint. Tentative proposals, 1945. Stratford Taumaranui Main Highway, Ohura River Bridge. Suggested plan layout (scale 1" to 15") and suggested elevation (scale 1" to 15" Nat).

Accession number
ARC2013-024
Collection type

Share

Public comments

Be the first to comment on this object record.

Google reCaptchaThis site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.