"Main Breakwater - end of addition"

Production date
1929
Description
Eight men standing on the end of the breakwater with a tower on the right surrounded by concrete blocks and the Tasman Sea. The 800 foot extension of the breakwater was completed on 12 April 1929 after four years of work, taking the total length to 3312 feet.